Skip to Content

Is your data ready for an EPM project?

Six things to have in place before the first workshop.

Table of contents

No titles in the blog post

Most EPM projects that struggle do not go wrong in the software. They go wrong in the data that is loaded into it. The configuration is sound, the consultants know the product, and the timeline is reasonable — until the first trial load exposes three different versions of the chart of accounts, entity codes nobody can explain, and two years of history that does not tie to the audited statements.

That is not a technology problem, and no vendor can solve it for you. It is preparation work, and the cheapest time to do it is before the project starts.

The research points the same way. In the AFP's 2025 FP&A Benchmarking Survey, 71% of respondents said they have EPM tools, yet 82% still rely on spreadsheets to prepare data before it goes into them (AFP). Gartner estimates that poor data quality costs organizations an average of $12.9 million a year, and notes that most organizations do not measure that cost at all (Gartner). In a consolidation project, that cost shows up as delays, rework and a system the finance team does not trust.

Here is what should be ready before the first workshop.

1. One agreed group chart of accounts

The group chart is the backbone of every report the system will produce. If it is still being debated during build, every mapping, rule and report gets built twice. Agree the reporting lines, the level of detail management actually uses, and which accounts carry movements for the cash flow and roll-forward schedules.

Ready means: a signed-off list of group accounts with clear definitions, and an owner who decides when a new account is needed.

2. Mappings from every local ledger

Each subsidiary's local chart needs to map to the group chart. This is where hidden problems surface: accounts used for different purposes in different countries, "suspense" accounts that hold real balances, and local accounts that should be split across two group lines.

Ready means: a mapping table for every entity, reviewed by someone who knows that entity's books, with no account left unmapped and no account mapped "for now."

3. A clean entity structure

List every legal entity, its functional currency, its parent, the ownership percentage and the date it was acquired or set up. Then add the entities that exist for management purposes only. Dormant companies, branches and joint ventures need a decision too: consolidate, equity-account or exclude.

Ready means: a single, dated ownership register that legal, tax and finance all agree with.

4. History that ties to the audited numbers

Teams almost always want comparatives in the new system, usually two or three years. Before you load them, prove they reconcile. If last year's consolidated balance sheet in the new system does not match the audited statements, every variance report will be questioned from day one.

Ready means: trial balances by entity and period that sum to the published consolidated figures, with the reconciling items explained and documented.

5. Intercompany partners identified at source

Intercompany eliminations only work if each balance carries a partner code. Many ledgers record intercompany activity in a handful of shared accounts with the counterparty buried in the description. If that is your situation, decide now how partner information will be captured — a new field, separate accounts, or a mapping rule — because retrofitting it during the project is slow and error-prone.

Ready means: every intercompany balance can be traced to its counterparty without reading journal descriptions.

6. Owners for every piece of master data

Accounts, entities, currencies, rates and mappings will keep changing after go-live. Someone has to approve each change. When nobody owns master data, the system slowly drifts back into the inconsistency it was meant to fix.

Ready means: a named owner and a simple change request process for each type of master data, written down before the build begins.

How long this takes

For a mid-sized group with ten to thirty entities, this preparation typically takes four to eight weeks of part-time effort from the finance team. That can feel like a delay before the "real" project starts. In practice, it is the most reliable way to shorten the project — and to avoid the change orders that follow when the data is discovered mid-build.

A useful test is to ask a simple question: if the system were switched on tomorrow, could you load one month of actuals for every entity and get a consolidated balance sheet that balances? If the honest answer is no, the gap is your data readiness plan.

Where to start

Start with the history reconciliation. It is the fastest way to discover whether your chart of accounts, mappings and entity structure are as clean as everyone believes. Whatever breaks there tells you where the preparation effort belongs.